Earthquake-proof construction
On behalf of construction company Geveke, Bresser has applied a temporary construction in the crawl space of the newly built apartment complexes A and B in Groningen (earthquake-area). After the special construction was installed, is was possible to cut en shorten the 220 concrete piles. In the spaces, the special earthquake isolators (base isolation) were accurately (on the millimeter!) placed between the specially developed steel permanent constructions.